Filter:
ORI GEN 2 Roller Shutter Chev Silverado 2500HD | GMC Denali 2500HD 2020+
ORI - Electronic Roller Shutter Chevrolet Silverado 1500 LTZ Trailboss ZR2 GEN 2
ORI RAM 2500 ROLLER SHUTTER with RAMBOX & Without 6.5' BED
ORI Roller Shutter DT RAM 1500 2nd Gen Ram & Rambox
ORI Electronic Roller Shutter Ford F150 2015 - 2025
ORI BED RACK SYSTEM For ORI Roller Shutters
ORI Electric Roller Shutter Ford F-250 F-350, Super Duty 6.8ft bed
ORI Toyota Tundra Roller Shutter 22+
ORI - Electronic Roller Shutter Chevrolet Silverado 2500 LTZ GMC Denali 2500 2011 - 2019
Are Ute Roller Shutters Waterproof?
Roller shutters come in a wide variety of designs and materials, but as a result, not all ute roller covers are waterproof. At Offroad Industries, we wanted to design a ute roller shutter that not only kept the contents of your ute’s tub secure but also protected from the elements.
On top of being waterproof, they’re also fitted with LED lights inside, meaning you can roll them back and find what you need in any condition, day or not.
With powder-coated aluminium slats that tightly overlap for optimal coverage, when you order a ute roller shutter from us, you’re getting a truck upgrade that was built for the Australian conditions. Our electric roller shutters come with a 24-month warranty, giving you plenty of time to put them to the test.
Can You Install Roller Shutters Yourself?
Yes, when you order ORI ute roller covers, we’ll also include instructions if you’d like to do the installation at home.
However, we do recommend getting them installed professionally, if you can, at one of our authorised installers. This ensures that you get a secure fit completed with the right tools. The final result will be a roller shutter that’ll stand the test of time, as well as keep any rain, dust or prying fingers out of the tub of your ute, all while saving you installation hours at home.
How Long Does It Take to Install Ute Roller Covers?
If you install your ute roller cover at home, it’ll typically take around four hours. However, an installer can get it done in around two to three hours.










